Trackway Installation

The final sculpture on the Sefton Coastal Path Sculpture Trail was installed at Hightown just before Christmas.

2015-12-02 17.39.31

This sculpture forms a trackway that runs along the new cycle path leading from Hightown to Crosby beach.

Over 20 feet of wood has been installed which contain artwork relating to the ancient man-made trackway that has been discovered in the area.

copper embossing (9)

For the artwork we visited Cambridge Children’s Centre and Brunswick Youth Club and delivered workshops based on metal embossing. The images are all of food that our ancestors would have eaten in the area.

Trackway Installation (4)

Going to the location we lay out the trackway

Trackway Installation (6)

making some on site adjustments

11222408_1061779797200227_5714353173399174154_n

and then a little bit of digging and turf removal

Trackway Installation (13)

12345524_1061780077200199_537716491176483748_n

12289713_1061780200533520_5829077292584312661_n

before lying them down and securing them in place.

Trackway Installation (1)

12345433_1061780350533505_3443220215370162329_n

Huge thanks to Fiona, John and Rachel, to all at the Cambridge Children’s Centre and the super kids and staff at the Brunny. And as always to Phill and Joe – Adam, you were missed – such a super installation team.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s